MODULUS HOUSING Plan your site

Built in the factory.Installed at your site.

Ancillary units, modular rooms inside PEB and multi-storey buildings, and data centres. Delivered without stopping production. Scroll to follow one unit from our line to your plinth.

Explore the scopes →

01Factory build

Built on a line, not on your site.

A compact PM office comes together under one roof: frame, floor, glazing, services and roof, while your plant carries on as normal.

02Test and load

Tested before it leaves.

Electrical, plumbing and leak checks are signed off in the factory. The office is lifted onto the trailer beside a precast bath pod, then strapped for the road.

03Transport

Road-legal, Pan-India.

Units are sized for standard trailers. Routes are surveyed and plant entry passes arranged before dispatch.

04Your site

Onto your site, straight to set-down.

We arrive with gate passes, a lifting plan and a route agreed with your safety team. Furnaces, conveyors and dispatch keep running.

05Lift and set

One lift, onto ready pedestals.

Our work zone is the unit's footprint plus the crane swing. Everything around it carries on.

06Precast bath pod

Set beside the office, in one piece.

A precast pod weighs several tonnes, so it travels on slings, not forks. A pick-and-carry crane lifts it off the trailer and sets it on its plinth next to the PM office.

07Plug in

Water, drain, power. Connected.

The pod connects to your network at one point per service: a valve chamber, a drain chamber and a feeder pillar, all prepared before we arrive. WCs, urinals and basins are already inside.

08Office workspace

A two-storey office workspace.

A light steel frame goes up first, then insulated PUF panels close it in, storey by storey. Where it suits the site, we stack factory-finished cabins instead.

09Handover

Ready to use. Your site never stopped.

Outdoors beside your roads, or inside your sheds: every unit is lit, connected and handed over with its documents. Barricades come down and the crane leaves the same day.

Plant running Unit at our factory Work zone footprint only

What we build

Three scopes. One partner.

Outside your buildings, inside them, and for your digital infrastructure. Select any unit on the elevation to see what arrives fitted from the factory.

Site elevation · select a unit
Outside buildings Inside buildings Water & drainage Power & data
OUTSIDEINSIDE PEB & MULTI-STOREYOUTSIDE PEB SHED MULTI-STOREY 1 2 A B C D 3 4 5 Bath podPM roomOfficeControlAny floorCanteenKitchenFirst aid

Typical uses

    I

    Ancillary, outside buildings

    II

    Inside PEB & multi-storey

    Programme

    Most of the work never reaches your site.

    A conventional build keeps a crew on your plant from foundation to finishing. With Modulus, your site sees the pedestals and the final set-down. Everything else happens in our factory, in parallel.

    16→6Weeks from order to occupation for a typical ancillary block
    ~80%Of the work moved off your site and into the factory
    1 dayTypical set-down and hook-up per module on site
    Work on your siteWork in our factory

    Indicative programme for a 6 to 10 module ancillary block. All figures are indicative and confirmed per project after the site survey.

    Made by Modulus

    Built in our factory. In use at yours.

    Two short films from our line: a precast gangmen rest room, then a bath pod with its plumbing, electricals and waterproofing built in. Both travel by road as complete units and go into service the day they are set down.

    1. 01

      Cast on our line

      Reinforced shells are cast and finished under cover, to the same standard every time.

    2. 02

      Carried complete

      Each unit leaves fitted and tested, on a standard trailer.

    3. 03

      In use on arrival

      Set down, connected and in service the same day.

    On site

    Built for plants that never stop.

    Steel plants run around the clock. These are the rules our site teams follow, so installing a facility is never a reason to halt production.

    Footprint-only work zone

    We barricade the unit's footprint and the crane swing. Roads, bays and the rest of your site stay open.

    Dry site, no wet work

    Pedestals are the only concrete. The unit arrives finished, so there is no curing time, slurry or debris near your operations.

    Lift windows you choose

    Crane lifts are planned around your shift changes, dispatch movements and hot-work permits, including nights and shutdowns.

    Your safety system first

    Permit-to-work, job safety analysis, toolbox talks and certified lifting gear for every lift, aligned with your EHS team.

    Single-point connections

    Water, drain, power and data each end at one point on the unit. Hook-up takes hours, and isolations on your network stay short.

    Relocatable later

    When your layout changes, units disconnect, lift and move to the next location. A facility can follow a project across the plant.

    Scope III

    Data centres, modular & containerised.

    Compute, power and control rooms built and tested in our factory, then delivered as complete modules next to your plant network. Fit-out ready for racks, cooling and fire systems.

    • DC & edge modules
    • MEP vaults
    • Power houses
    • Electrical & UPS rooms
    • Battery rooms
    • NOC & security rooms
    DC modulePower house

    Questions site teams ask us.

    What do you need from us before the units arrive?

    A site survey visit, the set-down location, the crane approach route, and connection points for water, drain, power and data. We share pedestal drawings so your civil contractor or ours can cast them in advance.

    Can you build rooms inside a running PEB shed?

    Yes, two ways. Flatpack: a light steel frame goes up and insulated PUF panels are placed into it with hand tools. Or factory-finished cabins come in through the shed door and are stacked. Either way there is no welding or wet work near your line, and work fronts are fenced off.

    How do rooms get onto upper floors of a multi-storey building?

    Components are sized to pass through goods lifts, hoists and standard openings, then assembled on the floor. They tie into the building's existing water and power risers.

    Can a unit be moved when our layout changes?

    Yes. Units disconnect at their single-point connections, lift off their pedestals and move to the next location. This suits project offices and contractor facilities that follow work across the plant.

    Do you work across all group locations?

    Our site teams work Pan-India. Transport routes, gate passes and lifting plans are prepared for each plant before dispatch.

    Plan your site

    Tell us what your site needs. We'll plan the rest.

    Share your plant location, the facilities you need and when you need them. We come back with layouts, a programme and a date for the site survey.

    1. 01

      Share your requirement

      Units, quantities, plant location and the date you need them on site.

    2. 02

      Site survey

      Our team walks the set-down points, access routes and service connections with your EHS team.

    3. 03

      Layouts and programme

      Drawings, specification and a factory-to-handover programme for your sign-off.

    Emailinfo@modulushousing.com
    Websitewww.modulushousing.com
    CoveragePan-India site teams